Tips To Prepare for D-VXR-DY-23 Dell VxRail Deploy 2023 Exam

Written by victoriameisel  »  Updated on: April 16th, 2024

Tips To Prepare for D-VXR-DY-23 Dell VxRail Deploy 2023 Exam

Achieving the Dell VxRail Deploy 2023 Certification is a significant accomplishment that demonstrates your expertise and proficiency in the VxRail field. To ensure that you are well-prepared for the D-VXR-DY-23 Dell VxRail Deploy 2023 exam, Passcert offers a comprehensive Dell VxRail Deploy 2023 D-VXR-DY-23 Dumps that are designed to cover all the essential exam topics and provide real exam questions and answers. By utilizing these valuable Dell VxRail Deploy 2023 D-VXR-DY-23 Dumps, you can fully equip yourself with the necessary knowledge and skills to pass the exam successfully and achieve your certification goals.

Dell VxRail Deploy 2023 Exam

Dell VxRail Deploy 2023 Exam focuses on the overall product, hardware, and software requirements to implement a basic VxRail cluster. This includes solution planning, using the VxRail Configuration Portal, hardware installation, environment validation, software implementation, solution validation, post-deployment changes, REST API, common issues, and troubleshooting of events.

The Dell VxRail Deploy 2023 Exam consists of two parts. Part 1 has a duration of 90 minutes and includes 50 questions. A passing score of 63% is required. Part 2 has a duration of 30 minutes and consists of 6 simulations. To pass Part 2, a score of at least 66% is required. It is important to note that passing scores are required on both parts of the exam in order to achieve certification.

Exam Topics

Introduction to VxRail (8%)

● Describe VxRail use cases, architecture, models, and software stack

● Describe VxRail management, licensing, and data protection options

VxRail Deployment Planning (7%)

● Describe vCenter server options

● Describe physical switches, NIC configurations, and DNS options

● Explain vSphere Distributed Switch features and usage

● Identify node discovery options

Using VxRail Configuration Tools (7%)

● Create VxRail projects and configurations

● Review completed configuration for implementation

VxRail Hardware Installation and Initialization (8%)

● Describe VxRail system racking and cabling procedures

● Configure VxRail Node Idrac and System Time

VxRail Network Environment Requirements and Initialization (13%)

● Configure VxRail network settings

● Validate the network environment manually

● Validate the network environment using the Network Validation Tool

Deploying the VxRail Cluster (13%)

● Describe how to generate the implementation procedure

● Perform a VxRail initialization with an internal vCenter Server

● Perform a VxRail initialization with an external vCenter Server

VxRail Post-Deployment procedures (18%)

● Perform post-installation validation of the VxRail cluster

● Describe how to implement licenses for a VxRail cluster

● Explain the vSAN configuration settings and configure required vSAN setting post-deployment

● Configure native backups

VxRail Cluster Upgrade and Expansion (8%)

● Describe VxRail upgrade requirements and activities

● Describe VxRail scale-out best practices and the cluster expansion process

VxRail Troubleshooting (10%)

● Perform VxRail log collections

● Describe VxRail troubleshooting resources and their uses

● Troubleshooting using vSAN tools

VxRail REST API (8%)

● Identify REST API functionality available in VxRail and use VxRail API to perform tasks

Share Dell VxRail Deploy 2023 Exam D-VXR-DY-23 Free Questions

1. An implementation engineer is tasked with expanding an 8-node VxRail E560 cluster with an S570 node. Each node has 1GbE RJ45 ports. What must the engineer consider when expanding the cluster?

A. All nodes in the cluster must be the identical series

B. E Series nodes require more capacity before expansion

C. Node limit has been reached on the cluster

D. AMD- and Intel-based nodes cannot be mixed

Answer: C

2. How can an administrator limit IPv6 traffic created by VxRail nodes?

A. Enable MLD snooping and querier

B. Tag VLAN 3939 on the ToR switches

C. Configure Link Aggregation

D. Create a unique VLAN for IPv6 traffic

Answer: A

3. Which vSAN license includes entitlement for vROps 8 Advanced Services?

A. Enterprise

B. Advanced

C. Enterprise Plus

D. Standard

Answer: C

4. During deployment of a VxRail E560F cluster the data on the node becomes corrupted due to a misconfiguration. Which option in the RASR menu should be selected to ensure the quickest restart of the installation?

A. Install DUPs

B. Factory Reset

C. Create RASRUSB

D. RASR Reset

Answer: B

5. An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?

A. Power distribution supports only the power rating of a single node

B. At least 24 in (61 cm) of clearance must exist in front of and behind the cabinet

C. Service laptop is on the same IP network as the iDRACs

D. Redundant power zones exist with adequate power cables

Answer: D

6. A VxRail cluster is being deployed with an external vCenter Server. What role needs to be assigned to the new VxRail Management User account within vCenter?

A. Read-only

B. Trusted Infrastructure Administrator

C. Administrator

D. No specific role

Answer: D

7. An implementation engineer is planning to deploy a new VxRail cluster. How long is the evaluation period for vSphere licensing on each node?

A. 90 days after nodes are powered on

B. 60 days after nodes are powered on

C. 60 days after nodes are delivered

D. 90 days after nodes are delivered

Answer: B

8. For which VxRail model must the iDRAC NIC Selection be set to LOM1?

A. G Series

B. E Series

C. D Series

D. S Series

Answer: A

9. An implementation engineer wants to check if the new node they added to the cluster is accessible to VxRail Manager. What can be used for discovery?

A. SRS

B. DRS

C. Loudmouth

D. Marvi

Answer: C

10. A system administrator attempts to use the VxRail REST API to obtain system health status for their VxRail environment. The system returns the following error code: 401. What should the administrator do to address this issue?

A. Provide vCenter credentials with sufficient rights

B. Ensure that the VxRail Manager IP address is correct

C. Use a REST API software package different than the native version of swagger

D. Use /v2/system instead of /v1/system

Answer: A